
Pet tech (GPS trackers, cameras, smart feeders, activity monitors)
Smart Dog GPS Tracker Collar, First Year Free Subscription, Real-Time Location, Geo-Fence Alerts, Route History, IPX7 Waterproof, 4G Built-in SIM, Health Monitoring
by Smart
Brand
Generic
Special Feature
First Year Free Subscription
Material
Plastic
Battery Life
150 Hours
Item dimensions L x W x H
2.3 x 1.3 x 0.8 inches
Item Weight
1.36 Ounces
Video previews
1 clipsHLS stream links (1)
About this item
- 1
REAL-TIME GPS TRACKING & 1-YEAR FREE SUBSCRIPTION: Powered by 5 global satellite systems and 4G/Wi-Fi technology, this tracker pinpoints your dog's location with 5-8 meter accuracy. Best of all, enjoy a complimentary 1-year premium subscription right out of the box! Unlock all advanced features with zero hidden fees for the first 12 months, giving you uninterrupted peace of mind.
- 2
CUSTOMIZABLE VIRTUAL FENCE: Instantly draw custom-shaped safe zones, alert areas, and no-go boundaries with an expansive range of up to 5 kilometers. Receive immediate smartphone notifications the moment your dog steps out of their designated safe space, ensuring your pup is always protected from wandering off.
- 3
COMPREHENSIVE WELLNESS MONITOR: Keep your furry friend in peak condition. Beyond location, effortlessly track your dog's daily fitness metrics including step count, distance traveled, active minutes, calories burned, and sleep cycles. Use these actionable insights to support their long-term health and vitality.
- 4
IPX7 WATERPROOF & RUGGED DESIGN: Built to withstand your dog's wildest adventures. Featuring a certified IPX7 waterproof rating and extreme temperature resistance (-30°C to 70°C / -22°F to 158°F), this durable tracker is perfect for year-round use—completely safe for swimming in lakes, rolling in the mud, and heavy rain.
- 5
EXTENDED BATTERY & MULTI-DOG APP: Effortlessly monitor your entire pack from a single, user-friendly app. Designed for convenience, the tracker delivers up to 150 hours of reliable performance in power-saving mode and features a rapid 2-hour quick charge, ensuring your hound is never left unprotected.
Product Specifications
| Additional Features | First Year Free Subscription |
| Battery Average Life | 150 Hours |
| Brand | Generic |
| Manufacturer | Petaura |
| Model Number | G761 |
| Warranty Description | 1 year |
| Item Dimensions | 2.3 x 1.3 x 0.8 inches |
| Item Weight | 1.36 Ounces |
| Enclosure Material | Plastic |
Key Features
Similar Products

Cat GPS
Cat GPS Tracker, Smart Cat Tracker Compatible with Apple Find My App (Only iOS), No Monthly Fee, Waterproof, Breakaway Collar Included (White Tracker, Pink Cat Collar)
$28.96

2
2 Pack GPS Tracker for Vehicles Pair with Apple Find My(iOS Only) Real Time Global Tracking Devices for Cars Hidden Magnetic Case No Subscribtion Mini Car Locator No Monthly Fee for Kids Pets Dogs
$29.99
![2 Pack Tracker Tag[Apple MFi Certified] Work with Apple Find My APP(iOS Only) Bluetooth Tracker Smart Locator Tags Item Key Finders Tracking Worldwide Waterproof for Luggage Bags Pet Wallet Backpack](https://m.media-amazon.com/images/I/61aOQRNGkmL.jpg)
Certified
2 Pack Tracker Tag[Apple MFi Certified] Work with Apple Find My APP(iOS Only) Bluetooth Tracker Smart Locator Tags Item Key Finders Tracking Worldwide Waterproof for Luggage Bags Pet Wallet Backpack
$19.99

2-in-1
2-in-1 GPS Tracker Dog Light | Smart Tracking Pet LED Light for iOS Only | IP68 Waterproof | 6 Modes Dog Collar Light for Night Walking, Camping | Works with Apple Find My, No Subscription
$29.99
Smart Dog GPS Tracker Collar,...
$59.99

