
Pet tech (GPS trackers, cameras, smart feeders, activity monitors)
Invoxia Minitailz - Health & GPS Tracker for Dogs #1 - Cardiac and Respiratory Scan - Real-time Location - Activity and Well-Being Analysis - Compact, Lightweight, and Easy to Install
by Invoxia
Customer Verdict
Customers appreciate the collar's GPS tracking capabilities, with one mentioning it accurately tracks walks and playtime. The health monitoring features receive positive feedback, with one customer highlighting the usefulness of breathing rate monitoring. <!-- k-injected k+b64 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
Pattern
Striped
Color
Grey
Material
Leather, Nylon, Polyester
Brand
invoxia
Product Dimensions
2.32"L x 1.18"W
Video previews
1 clipsAbout this item
- 1
HEALTH & GPS TRACKER FOR DOGS #1: Minitailz is the essential ally for keeping an eye on your dog, featuring cardiac and respiratory scanning, real-time location tracking, and analysis of activity and well-being.
- 2
HEALTH SCAN: Analyze your dog's heart and respiratory rates at rest, whether in a preventive or curative approach. Discover your dog's cardiac signature, a unique representation of the beats of its heart.
- 3
GPS TRACKER: Locate your dog at any time with real-time tracking. Access the complete history of its movements.
- 4
ACTIVITY MONITORING: Ensure that its level of activity and exercise matches its needs (walking, playing, running), track its meals, and monitor the quality of its sleep.
- 5
SUBSCRIPTION REQUIRED: Coverage of all expenses for the integrated SIM card, starting from $9.60 per month. 30-day money-back guarantee.
- 6
2 YEAR WARRANTY - Buy with confidence. Benefit from a 2-year warranty. Research & development carried out by IoT & artificial intelligence specialists for high-performance tracers
- 7
TESTIMONIALS - More than 400,000 users thank us! Benefit from Invoxia technology, recognized worldwide with 7 consecutive victories at the international innovation fair.
What Customers Are Saying
Based on 75 customer ratings
Customers appreciate the GPS tracking features of the collar, with one customer noting it accurately tracks walks and playtime, while another mentions it provides heart rate and activity level metrics.
8 mentions
Customers appreciate the health monitoring features of the collar, with individual reviews highlighting its activity and well-being analysis, breathing rate monitoring, and one customer noting how it helped keep their pet's kidney disease stable.
7 mentions
Product Specifications
| Brand Name | invoxia |
| Breed Recommendation | All Breeds |
| Included Components | Bell, Remote Control |
| Dog Breed Size | Large |
| Animal Collar Type | Basic Animal Collar |
| Item Length | 2.32 Inches |
| Manufacturer | Invoxia |
| Pet Type | Dog |
| Manufacturer Part Number | 1 |
| Model Number | LWT6_Dog |
| Item Weight | 37 Grams |
| Target Species | Dog |
| Age Range Description | All Life Stages |
| Warranty Description | 2 Year Manufacturer |
Key Features
Similar Products

Cat GPS
Cat GPS Tracker, Smart Cat Tracker Compatible with Apple Find My App (Only iOS), No Monthly Fee, Waterproof, Breakaway Collar Included (White Tracker, Pink Cat Collar)
$28.96

2
2 Pack GPS Tracker for Vehicles Pair with Apple Find My(iOS Only) Real Time Global Tracking Devices for Cars Hidden Magnetic Case No Subscribtion Mini Car Locator No Monthly Fee for Kids Pets Dogs
$29.99
![2 Pack Tracker Tag[Apple MFi Certified] Work with Apple Find My APP(iOS Only) Bluetooth Tracker Smart Locator Tags Item Key Finders Tracking Worldwide Waterproof for Luggage Bags Pet Wallet Backpack](https://m.media-amazon.com/images/I/61aOQRNGkmL.jpg)
Certified
2 Pack Tracker Tag[Apple MFi Certified] Work with Apple Find My APP(iOS Only) Bluetooth Tracker Smart Locator Tags Item Key Finders Tracking Worldwide Waterproof for Luggage Bags Pet Wallet Backpack
$19.99

2-in-1
2-in-1 GPS Tracker Dog Light | Smart Tracking Pet LED Light for iOS Only | IP68 Waterproof | 6 Modes Dog Collar Light for Night Walking, Camping | Works with Apple Find My, No Subscription
$29.99
Invoxia Minitailz - Health &...
$99.00

