GPS Tracker Device for Car and Vehicles: Mini Hidden Magnetic no Subscription Trackers for Tracking Kids Elderly Vehicle pet - Real Time Location Track Devices no Monthly Fee for Android and iPhone

Pet tech (GPS trackers)

GPS Tracker Device for Car and Vehicles: Mini Hidden Magnetic no Subscription Trackers for Tracking Kids Elderly Vehicle pet - Real Time Location Track Devices no Monthly Fee for Android and iPhone

by GPS

3.3(180 ratings)
$21.99

FREE delivery Friday, May 8

Only 9 left in stock - order soon.

Check Price on Amazon

Customer Verdict

Customers find the GPS tracker easy to program and appreciate its compact size, with one mentioning it can fit discreetly inside a headlight. The device is praised for being perfect for discreet tracking and added security. However, the functionality and accuracy receive mixed reviews, with some saying it works flawlessly while others report it doesn't work or track properly. Moreover, location updates are slow, taking hours to update, and customers disagree on the product's value for money. <!-- k-injected k+b64 eyJrLW9ic2VydmUiOiIiLCJrLWNvbXBvbmVudCI6IlNoYXJlZENvbnRlbnQtOG96aXhjXzg5czBncmJfIiwiay1pZCI6IjkwZTg4M2EyLTYxNzEtNDUxYi04ZGEwLTEwYzI2Y2NkMzkwMSIsImstZGF0YSI6eyJzaGFyZWRTZW50aW1lbnRzIjpbeyJhc3BlY3RzIjpbeyJzdW1tYXJ5IjoiQ3VzdG9tZXJzIGZpbmQgdGhlIEdQUyB0cmFja2VyIGVhc3kgdG8gcHJvZ3JhbSwgd

Brand

VVyL

Special Feature

Long Battery Life, Magnetic, Real Time Tracking

Connectivity Technology

Bluetooth

Supported Application

SeekTag

Specific Uses For Product

Vehicle Tracking, Pet Tracking, Child Monitoring, Asset Tracking

Video previews

8 clips

About this item

  • 1

    Real-Time Location Tracking with No Monthly Fees: Keep track of what matters most without any hidden costs. This GPS locator uses the SeekTag app to show your item's real-time location on your phone. There are no subscriptions and no SIM card required, making it a cost-effective tracking solution for your auto, motorcycle, truck, or trailer. You can track over a long distance with peace of mind.

  • 2

    Universal Compatibility for Both iOS and Android: Whether you use an iPhone or an Android phone, this smart tracker works seamlessly for everyone. Simply download the free SeekTag application, pair the device via wireless Bluetooth connection, and you're ready to start tracking. It's the perfect personal equipment for families with mixed phone types.

  • 3

    Compact, Durable Design with Multiple Attachments: Despite its powerful tracking capabilities, this device is remarkably small, tiny, and portable. The included magnetic mount securely attaches to metal surfaces, while the keychain allows for easy attachment to dog collars, kid backpacks, or luggage. With an IP65 rating, it's protected against dust and water splashes, ready for any adventure.

  • 4

    Versatile Tracking for Your Valuables, Pets, and People: This isn't just for cars. Use it as a pet tracker to monitor your dogs & cats` location, a child locator for your children's safety, or an item finder for your bags and valuables. Its long range and tiny size make it an incredibly versatile tool for protecting your people and possessions from being lost.

  • 5

    Reliable and Discreet for Long-Term Use: Engineered for reliability, this locator is designed for long-term use. Its efficient power management ensures a long battery life up to 360 days, providing extended tracking without frequent replacement battery. The small and undetectable design allows for discreet placement on your auto or other personal items, offering a reliable security solution.

What Customers Are Saying

Based on 180 customer ratings

ease of use89% mixed

Customers find the GPS tracker easy to program, with one mentioning it's simple to link to their phone and another noting it's convenient to check in anytime.

18 mentions

compact size100% mixed

Customers appreciate the tracker's compact size, with one mentioning it's small enough to fit discreetly inside the headlight.

10 mentions

discreet90% mixed

Customers appreciate that the GPS tracker is discreet and easy to hide, making it ideal for added security.

10 mentions

functionality55% mixed

Customers have mixed experiences with the GPS tracker's functionality, with some reporting that it works very well and the real-time tracking works great, while others mention that it does not work or track at all.

31 mentions

accuracy38% mixed

Customers have mixed experiences with the GPS tracker's accuracy, with some finding it very good, while others report it is not accurate.

26 mentions

quality50% mixed

Customers have mixed opinions about the GPS tracker's quality, with some finding it excellent and impressive, while others describe it as horrible.

24 mentions

value for money67% mixed

Customers have mixed opinions about the GPS tracker's value for money, with some finding it a great product for the price, while one customer describes it as a cheap rip-off.

9 mentions

location updates25% mixed

Customers report that the GPS tracker's location updates are slow, taking hours to update and not being real-time.

12 mentions

Product Specifications

Additional FeaturesLong Battery Life, Magnetic, Real Time Tracking
Connectivity TechnologyBluetooth
Supported ApplicationSeekTag
Specific Uses For ProductVehicle Tracking, Pet Tracking, Child Monitoring, Asset Tracking
Battery Average Life365 days
Compatible DevicesSmartphone
Battery Capacity3600 Milliamp Hours
Smart Home CompatibilityNot Smart Home Compatible
Enclosure MaterialAcrylonitrile Butadiene Styrene (ABS)

Key Features

Real-Time Location Tracking with No Monthly Fees: Keep track of what matters most without any hidden costs. This GPS loc...
Universal Compatibility for Both iOS and Android: Whether you use an iPhone or an Android phone, this smart tracker work...
Compact, Durable Design with Multiple Attachments: Despite its powerful tracking capabilities, this device is remarkably...
Versatile Tracking for Your Valuables, Pets, and People: This isn't just for cars. Use it as a pet tracker to monitor yo...
Reliable and Discreet for Long-Term Use: Engineered for reliability, this locator is designed for long-term use. Its eff...

GPS Tracker Device for Car...

$21.99

View on Amazon
Pet Care Labs logo

Pet Care Labs

Science · Compassion · Care

Share this page

Found something useful? Pass it along! 🐾

Help other pet owners discover trusted, science-backed advice.