Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (4-Mo Subscription Included)

Pet tech (GPS trackers, cameras, smart feeders, activity monitors)

Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (4-Mo Subscription Included)

by Cat GPS

3.8(402 ratings)
$49.95

FREE delivery Friday, May 1

In Stock

Sold by: Myloc8

Check Price on Amazon

Customer Verdict

Customers find the GPS tracker intuitive to set up and appreciate its lightweight design, with one noting it's comfortable for their cat to wear. The device receives positive feedback for its quality and value, though opinions are mixed regarding battery life, with some reporting it lasts longer than expected while others say it doesn't last as long. Functionality, accuracy, and tracking speed also receive mixed reviews, with some finding it works well while others report it doesn't work at all. Value for money is debated, with some saying it's worth the subscription while others consider it a waste of money. <!-- k-injected k+b64 eyJrLW9ic2VydmUiOiIiLCJrLWNvbXBvbmVudCI6IlNoYXJlZENvbnRlbnQtV2xNRVJ3el9CYlo0NUx1Iiwiay1pZCI6IjAyMzJmYTljLTI3YTktNDhiYi05NjYyLTllOGYzMDE5NDM3YSIsImstZGF0YSI6eyJza

Brand

PETLOC8

Special Feature

Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device

Connectivity Technology

4G LTE CAT 1, Bluetooth, Wi-Fi

Supported Application

iOS App, Android App

Specific Uses For Product

Pet Monitoring, Cat Tracking

Material

Plastic

About this item

  • 1

    Enjoy peace of mind knowing your device comes with 4 months of subscription included. After four months, you can continue using the device with the flexible and transparent tariff plan you choose (check the product gallery to see the tariff plans).

  • 2

    NEVER LOSE YOUR CAT – Works Anywhere With 4G Sim - Real-time GPS tracking shows your cat’s exact location anytime, anywhere. iOS & Android app.

  • 3

    ULTRA-SMALL & LIGHTWEIGHT – The smallest waterproof tracker for cats, designed to be collar-compatible and comfortable for daily wear.

  • 4

    SMART ALERTS & GEO-FENCE – Get instant notifications if your cat leaves a safe zone.

  • 5

    LONG-LIFE RECHARGEABLE BATTERY – Up to 14 days on a single charge for worry-free protection.

What Customers Are Saying

Based on 402 customer ratings

quality91% mixed

Customers find the GPS tracker to be of excellent quality, with one customer describing it as a sophisticated tool.

56 mentions

ease of use87% mixed

Customers find the GPS tracker easy to use, with the app being intuitive to set up and simple to attach.

53 mentions

weight90% mixed

Customers appreciate that the GPS tracker is lightweight, though some find it heavy.

21 mentions

functionality58% mixed

Customers report mixed experiences with the GPS tracker's functionality, with some saying it works great and functions well for their pets, while others mention that it stops working after a while or won't turn on at all.

77 mentions

battery life53% mixed

Customers have mixed experiences with the GPS tracker's battery life, with some reporting it lasts longer than expected while others find it doesn't last as long.

55 mentions

accuracy60% mixed

Customers have mixed experiences with the GPS tracker's accuracy, with some finding it extremely accurate for real-time location tracking, while others report that it is not very accurate.

43 mentions

value for money66% mixed

Customers have mixed opinions about the GPS tracker's value for money, with some finding it worth the subscription while others consider it a waste of money.

29 mentions

tracking speed37% mixed

Customers have mixed experiences with the GPS tracker's speed: while some appreciate the real-time tracking and fast updates, others report that it takes longer than normal and is slow to respond.

19 mentions

Product Specifications

Additional FeaturesAlert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
Connectivity Technology4G LTE CAT 1, Bluetooth, Wi-Fi
Supported ApplicationiOS App, Android App
Specific Uses For ProductPet Monitoring, Cat Tracking
Battery Average Life14 days
Compatible DevicesiOS Devices, Android Devices
Battery Capacity2880 Milliamp Hours
Smart Home CompatibilityNot Smart Home Compatible
BrandPETLOC8
Built-In MediaCollar Mount, User Manual, GPS tracker, Charging Cable
ManufacturerPETLOC8
Model NumberCat - 4 Months Free
Warranty DescriptionSee product for details
Unit Count1.0 Count
Item Weight1.06 Ounces
Enclosure MaterialPlastic

Key Features

Enjoy peace of mind knowing your device comes with 4 months of subscription included. After four months, you can continu...
NEVER LOSE YOUR CAT – Works Anywhere With 4G Sim - Real-time GPS tracking shows your cat’s exact location anytime, anywh...
ULTRA-SMALL & LIGHTWEIGHT – The smallest waterproof tracker for cats, designed to be collar-compatible and comfortable f...
SMART ALERTS & GEO-FENCE – Get instant notifications if your cat leaves a safe zone.
LONG-LIFE RECHARGEABLE BATTERY – Up to 14 days on a single charge for worry-free protection.

Cat GPS Tracker – Smallest...

$49.95

View on Amazon
Pet Care Labs logo

Pet Care Labs

Science · Compassion · Care

Share this page

Found something useful? Pass it along! 🐾

Help other pet owners discover trusted, science-backed advice.