
Pet tech
Cat GPS Tracker Collar, No Monthly Fee, Real-Time Location Tracking, Virtual Fence, Daily Historical Route, Activity Monitor & Sound Light Alert
by Cat GPS
Color
Orange
Material
Nylon
Brand
Ysnusine
Closure Type
Buckle
Breed Recommendation
Cat
Number of Items
1
Video previews
0 clipsThis product has video media, but direct MP4 preview URLs are unavailable in the current payload.
About this item
- 1
✅ Perfect Fit for Target Pets: Lightweight Pet-Friendly Design (9.8-12.6″ Neck) (Comfort Wear Scenario). Exclusively sized for adult cats and small dog breeds (neck circumference 9.8-12.6in), such as miniature poodles, British Shorthairs, and Maine Coons, not for too small kitten and too big dog. The soft, durable nylon collar is lightweight, non-irritating to sensitive pet necks, and adjustable for all-day comfortable wear without restricting movement.
- 2
✅ Budget-Friendly Long-Term Use: 100% No Recurring Monthly APP Fees, Clear Cost Transparency.Tailored for pet parents tired of expensive subscription-based pet trackers, this collar comes with a free dedicated iOS/Android APP with zero membership fees, no annual contracts, no hidden charges—only requires a standard Nano-SIM card with just monthly data fee, cutting long-term ownership cost by 50%+ versus subscription trackers. Top economical choice for daily pet safety monitoring.
- 3
✅ All-Scenario Precise Positioning: Indoor + Outdoor Real-Time Tracking for Roaming Pets (Lost Prevention!) Adopts upgraded Beidou/GPS + WiFi + LBS quadruple-mode high-precision positioning, delivering stable, accurate real-time location data whether your adult cat sneaks into the backyard, hides under furniture, or your small dog explores the neighborhood. Unlike single-mode trackers that fail indoors or in weak signal areas, this multi-network positioning works seamlessly in residential areas, parks, and semi-enclosed spaces, eliminating blind spots and drastically reducing the risk of pet loss—perfect for curious indoor-outdoor pets and escape-prone fur babies.
- 4
✅ 24/7 Smart Safety Guard: Custom Virtual Fence & Instant Alert. Designed for pet owners who worry about their pets wandering off, this tracker lets you set custom safe zones (geo-fences) via the free APP in seconds. You’ll receive instant push notifications to your phone the moment your pet leaves the preset area, enabling quick response and retrieval. The ultra-sensitive alert system works day and night, providing round-the-clock safety protection, ideal for busy pet parents, solo pet owners, and households with adventurous pets that love to roam.
- 5
✅ Full-Featured Pet Care: Historical Route, Activity Monitor & Quick Finder .More than just a location tracker, it’s an all-in-one pet health and safety companion. Check daily historical movement routes to track where your pet has wandered, monitor daily exercise and rest status to manage their health effectively, and use the built-in sound & LED light alert to quickly locate hidden pets at home or nearby. This multi-function design adds extra value beyond basic tracking, catering to pet parents who want comprehensive pet monitoring and hassle-free retrieval.
- 6
✅ Ideal For: Adult cat owners (9.8-12.6in neck), small dog breed parents, pet owners seeking non-subscription app trackers, households with indoor-outdoor pets, and anyone need pet trackers. This tracker combines safety, affordability, and comfort to be your pet’s ultimate safety companion.
Product Specifications
| Brand Name | Ysnusine |
| Breed Recommendation | Cat |
| Dog Breed Size | Small |
| Manufacturer | Ysnusine |
| Model Number | Small |
| Age Range Description | all life stages |
| Warranty Description | 1 Year Manufacturer |
| Number of Items | 1 |
| Color | Orange |
| Material Type | Nylon |
| Closure Type | Buckle |
Key Features
Similar Products

Automatic
Automatic Cat Feeder, Adjustable 1080p Camera, 5G WiFi & App Control Cat Food Dispenser, Automatic Feeder Cat Dry Food with Dual Power & Voice Recording, Smart Automatic Dog Feeder Portion Control
$59.99

2026
2026 Upgraded Pet Camera Movable 1080P, 2-Way Audio Cat/Dog Camera Robot, Night Vision, Battery-Operated, Auto-Recharge Smart Cam with App Control, Motion Detection, Support Cloud & SD Card Storage
$139.49

Tracker
4 GPS Dog Tracker Rubber Clip Compatible with Tracti Dog 6 GPS Dog Collar Replacement Safety Clip Accessories Black
$10.99

2025
2025 GPS Tracker for Pet, No Monthly Fee & No SIM Card Needed | Real-Time Tracking for Dogs, Cats & Small Animals | Lightweight Design | Long Battery Life | Compatible with iPhone & Android
$34.99
Cat GPS Tracker Collar, No...
$69.99

